| |
|
Morritt’s Grand
Phases I & II (6000 & 7000 Bldgs):
Build Phase I & II
of this luxury 232-room, 5-storey hotel, part of the world renowned
Morritt’s Tortuga Resort, for Morritt’s Properties (Cayman) Ltd.
The 2nd
Phase also includes a full basement with cistern and storage rooms.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Morritt Tortuga
4000-1 Bldg: Demolish and
re-build the 5-storey hotel building, inclusive of twenty-six (26)
1-bedroom & 2-bedroom unit |
|
|
|
Morritt Tortuga &
Grand Resorts – Hurricane Remedial Works –
extensive external
and internal repairs throughout the Resort, including the Grand I & II
Bldgs., the Tortuga 3000, 5000 & 4000-2 Bldgs., demolition of the
Tortuga 2000 & 4000-1 Bldgs. (for re-build), renovations to the Main
Bldg, incl. the Reception, Lobby, Lounges, Conference Room, Business
Centre, repair pools, replace / repair underground piping, sewage
treatment plant, re-asphalt parking lots, replace parking stops,
exterior lighting and walkways.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Marriott Beach
Resort
– Extensive renovations to 300 rooms on all five (5) floors and major
hurricane remedial works throughout the Resort. Resort
upgraded to 5-Star rating. |
|
|
|
|
|
Compass Pointe
Dive Resort Phase 1:-Build
eighteen 1- & 2-b/rm units, 3-storey condominiums. |
|
|
|
|
|
Cobalt Coast
Resort:
Build structure for 26-unit, 3-storey, luxury dive resort including
Cayman’s first use of the Royal Building System for the construction of
a 200’ long X 10’ high retaining seawall for Cobalt Coast Development
Limited. |
|
|
|
|
|
|
|
|
|
|